Installation
Simple and low cost installation
We can reduce construction time and cost by shortening fieldwork while simplifying turbine design and assembly. Our customers enjoy lower construction costs, and turbines that are among the easiest to install in the field.
For the 3MW turbines, we can cluster wind turbines together and connect them to skid-mounted transformers and switchgear, eliminating the need for a substation altogether, realizing significant balance of plant savings and reducing electrical losses.
Savings vary by:
- Substation voltage
- Project size
- Distance to point of interconnect (POI)
With its major parts center located in Mississauga, Ontario and field services crews that service sites across Ontario, GE has the ability to mobilize across the Province.
Combining the strengths across GE, we also provide substation equipment with complete design, procurement and installation services.
Click here for additional information on grid offerings or contact us for details on the balance of plant and other aspects of installation.